• For more information on Green Party membership or to contact Green Party leadership, email [email protected] Join the Arlington Greens in person on Wednesday, Oct 5, 2022, at 7 PM in the community room of the Ballston Firehouse located at Wilson Blvd and George Mason Drive.

October 20, 2014

Arlington school bonds-not ready for approval

Development,schools — @ 5:15 pm

westover library-reed school
(photo of Reed School with Westover Library)

Arlington Greens chairman speech to Arlington Council of PTAs, on Oct. 20, 2014

Good evening members of Arlington PTAs. Let me congratulate you for your volunteer work to improve our community’s public education.

I am John Reeder, an Arlington resident, graduate of Yorktown High School, father of three daughters all graduates of Arlington Public Schools, and chairman of the Arlington Green Party. My wife was a 40-year Fairfax elementary school teacher, and my daughter teaches English in Washington, D.C.

I support spending for public education for all children and excellent salaries for our teachers and school staff. I support capital spending to provide more class rooms, but cannot support throwing money at capital projects without foresight and planning.

I urge you and other Arlington voters to reject the $105.8 million dollar school bond on the November ballot.

Here’s the short answer as to why voters should vote no: the school system is not ready to thoughtfully spend $106 million to add seats to last 30 years.
We voters cannot trust APS to effectively invest these funds without a detailed and a comprehensive plan that parents, educators, and the community all can support. Unfortunately, the APS has failed to accurately project enrollment and capacity over the past two decades.
The board should first prepare a specific plan that supports students and educational programs and adds seats, with engineering and reasonable cost estimates. Then ask voters for an adequate bond for very specific projects, be it for $106 million or $306 million.

Capital funds do not immediately produce new seats. We should not hurry to waste and misapply one hundred million dollars building the wrong or too small schools, and then have to rebuild the same schools in five years. Just 5 years ago, a new, $100 million W-L high school was opened for 1,500 students, but now has 2,046 students.

The school board spends over $500 million annually for operating costs, and now without a detailed, engineering plan, it will get another $106 million to spend somewhere and hope for the best.

There is confusion and missing leadership among school board members and the superintendent. There will be two new school board members this year; parents and PTAs are still divided over where and how new seats should be added. The school board failed to timely adopt a CIP which would have settled the capacity expansion.

There are many unanswered questions:
Will HB Woodlawn move to the Reed School or to a new Wilson site?
Will APS build a new elementary school next to TJ Middle School?
Where should more seats be added and how?
Can we preserve green space around our schools?
Will engineering plans reduce the carbon footprint of new buildings?
Can APS reduce the over $70,000 cost of adding one seat?

Voters: Please reject this bond request.

APS should come back to voters in a year and provide citizens with a well thought out, detailed plan to address the enrollment increase, and then present a detailed bond question to voters so that we in the community can make an informed decision.
Thank you

Tagged:

October 14, 2014

Adding new schools in Arlington-follow Fairfax’s example and convert an office building

Development,schools — @ 12:06 pm

The Washington Post reported on October 13 about a new elementary school in Baileys Crossroads, Fairfax that is a former office building that can hold 800 students. The cost of the Baileys building including the $9 million cost of buying the empty office building was about $20 million for a student capacity of 795 (they have 700 students today). Baileys Elementary is considered one of the premier elementary schools in Fairfax County, specializing in art and music and drawing students from all over Fairfax as well as the Baileys Crossroads.

baileys elementary new school
(photo of new Baileys Elementary School, courtesy of Fairfax County Public Schools)

So an 800-student school cost $20 million; that’s about $25,000 per student. Arlington is building a new elementary at Williamsburg MS for a $73,000 per student cost, nearly 3 times the Fairfax cost, and the land there is free unlike Baileys.

http://www.washingtonpost.com/news/digger/wp/2014/10/08/what-to-do-with-dying-suburban-office-buildings-turn-them-into-schools/

Why can’t Arlington Public Schools buy an empty office building and convert it into a 800-student elementary like Fairfax for $20 million? Drive a hard bargain like FCPS did, and buy a vacant office building. Several months, we wrote an article for Arlington Greens about the over 25 percent office vacancy rate in Crystal City and Rosslyn and the need to recycle these empty office buildings into residential apartments and schools.

Suppose APS paid $20 million for a similar sized building in Crystal City or Rosslyn, and spent $14,000 per student to remodel it into a school like FCPS, a 800 student school would still cost only $32 million or $40,000 per student.

APS is spending $46 million to build the new elementary for only 630 students at the Williamsburg MS campus in 97,000 square feet of space, slightly smaller than the new Baileys Crossroads School. APS cost does not include any funds to buy an existing office building just construction costs using public land. Also, do they really think that only 690 students will enroll there?
http://www.apsva.us/Page/18930
So the cost per student is $46 million / 630 = $73,000 per student seat at the new Williamsburg ES

Arlington is supposed to add 6,000 more students over the next ten years; at $73k per student seat, the APS will need to spend about $440 million for 6,000 more seats. That would mean issuing $440 million in school bonds.

Tagged:

October 6, 2014

Arlington Greens Vote to Oppose All Four Arlington Bond Questions on the November Ballot

Arlington Greens Vote to Oppose All Four Arlington Bond Questions on the November Ballot

October 6, 2014

The Arlington Greens voted unanimously at their October 2nd meeting to ask Arlington voters to deny the four bonds on the ballot on November 4: the four bonds total $218 million, the largest being $106 million for Arlington Public Schools.

The Greens indicated that the bond questions on the ballot for voter approval or denial were too broad and non-specific, and were essentially blank checks to the Arlington School Board and to the Arlington County Board to spend money for undefined purposes and without any cost or engineering plans.

John Reeder the Arlington Greens chairman said, “Arlington parents distrust the school board, and many feel duped by the School Board’s failure to approve a detailed CIP (Capital Improvement Plan). South Arlington parents were promised years ago a new elementary school, now proposed to be built on scarce parkland next to TJ Middle School.” He added, “Arlington parents should remember that critical on-going school programs were put on the chopping block in the past spring; and now a confused school board and a superintendent propose to rush spending $106 million on plans that are less than educationally optimal for our students.”

Reeder said the County Board similarly failed to specify for its three bond questions exactly where and how it will spend $61 million on transportation infrastructure, $13 million for local parks and recreation, and $39 million on “county facilities, information technology, and infrastructure.” He said, “voters should be wary of allowing the county board to spend over $100 million without detailed engineering and vetted plans because of these past abuses.”

Reeder added, “This county board built a million dollar bus stop on Columbia Pike, diverted many millions of park bond dollars approved by voters for park land acquisition to remodeling a failed Artisphere, and now proposes to spend over $300 million on a doomed trolley.”

The Arlington Green Party has run candidates for the Arlington County Board for the past 8 years. This year it has endorsed, independent county board member John Vihstadt for election in the November election.

Tagged: