Proposed new Lubber Run Recreation Center: Too big and too expensive

Development,environment — @ 3:42 pm

The Arlington County Board is considering a replacement building for the Lubber Run Recreation Center at its July 18th meeting. Neighborhood activist and environmentalist Suzanne Smith Sundburg and others have commented that the new building will destroy hundreds of nearby trees and open green space and intrude into the nearby natural area along the run nearby and have negative impact on storm water. Also the proposed new building would be one of the most expensive rec centers ever built.

Lubber Run Rec Center, courtesy Arlington County

Here is the Suzanne’s public letter to the Arlington County Board:

July 17, 2017

Dear Chair Fisette and members of the Arlington County Board:

For the reasons outlined below, I respectfully request that you defer taking action on item 52 (Lubber Run Community Center – Endorsement of the Conceptual Design) on the County Board’s July 18, 2017, meeting agenda. Due to work commitments, I may be unable to comments in person on Tues. I ask that these comments (including attachments) be added to the public record for this item.

Whereas I welcome the very modest reduction in building footprint and other changes that staff released at 4:20 pm on Friday, the fact remains that “If the Board endorses the final design concept, the building layout and massing remain fixed.”—per the staff report.

Staff’s July 14 listserv message is remarkably free of detail. For example, it fails to mention any reduction in the number of trees (previously reported: 124) that are to be removed. Without more detail, it is impossible to know whether staff’s changes will result in any consequential reduction in the environmental harm to the site.

Essentially, the public is being denied an opportunity to provide meaningful feedback on the design even though significant issues remain. Here are my concerns: 1) flawed process, 2) environmental impact and 3) cost.

Process Issues

Staff also appears to have ignored a request from the Public Facilities Review Committee. Below is an excerpt from a PFRC 5-16-17 letter (attached):

Notification for PFRC meetings should be distributed to the larger Lubber Run listserv as there is room for public comment at the meeting.

According to a resident who is on the LRCC listserv, he received no announcements of PFRC meetings. And in one instance, staff scheduled an LRCC public meeting that conflicted with a PFRC meeting also being held to review the LRCC project.

Staff’s perception of the community’s feedback on this project continues to be at odds with the public’s perception of what it has asked for. Namely, staff’s open-ended survey encouraged wishful thinking (without providing any reality-driven cost or environmental impact information). Not surprisingly, staff received a wide range of sometimes-conflicting aspirations and desires. However, there was one consistent and clearly expressed theme:

Save the site’s trees and make environmental protection/habitat preservation a priority.

In Appendix A (at the bottom) are comments extracted from the first 13 responses (out of the 66 identified respondents) — a 20% sample — to staff’s survey. They document strong community commitment to preserving natural habitat and environmental conservation on the LRCC site.

This community’s desires are consistent with the countywide survey results reported in the draft Public Spaces Master Plan; see p.58, Figure 17. Arlingtonians are hungry for nature and green space, not more built infrastructure and pavement. Yet, staff consistently chooses pricey, expensive-to-maintain built infrastructure over less expensive, more flexible, environmentally sound and sustainable recreational options.

Surprisingly, neither the PFRC letter nor the Natural Resources Joint Advisory Group letter (attached) was uploaded to the project page or made available as part of staff’s report. Had I not asked about the geotechnical engineering/borings report, it, too, never would have seen the light of day. The public and County Board members deserve to have timely access to all relevant information (whether or not it supports staff’s position) before being asked to make decisions of this magnitude.

Environmental Considerations

I’ve already discussed with the County Manager (message attached), the remarkably similar conditions on the LRCC site to the Ashlawn Elementary School site, where the steep grade, removal of approx. 100 trees and expansive soil disturbance/site re-grading have exacerbated runoff and triggered ongoing stormwater management failures — including erosion and sediment problems that add to water quality and flood risk issues for nearby Four Mile Run.

The E2C2, NRJAG and PFRC letters were consistent in their pleas for tree preservation, habitat conservation and an environmentally sound plan/design, with the PFRC saying:

PFRC members would generally like to receive more information on the trees that would be lost for each of the schemes and generally believes that existing trees and landscape should take precedent over manmade landscape and newly planted trees wherever possible. …

The draft geotechnical engineering (borings) report clearly documents water on the site. Specifically pp. 11–13 go into great detail describing possible remedies for hydrostatic pressure and water around the building’s footings.

Absent from the report is any information about flow tests, which would determine roughly how much water is flowing beneath the site, its speed and direction. Water doesn’t disappear when you place obstructions in its path. It simply goes elsewhere. But when you don’t know how much water there is or where the water is coming from and going to, how can proper choices be made? It’s a bit like a doctor deciding to operate without first taking x-rays or an MRI of the area in question.

Likewise, staff’s remark about the project’s meeting the Chesapeake Bay Preservation Ordinance and the Stormwater Management Ordinance rings with irony. As we have all seen on the Ashlawn site — where these regulations applied and yet significant environmental degradation resulted — these assurances are meaningless.

Staff appears to take the position that if something isn’t prohibited by law or regulation, then it must be acceptable. This reasoning matches the justifications provided by Martin Shkreli for price-gouging lifesaving medicine and Donald Trump, Jr., for meeting with Russian agents.

Laws and regulations are not substitutes for exercising sound judgment, informed decision-making and employing basic common sense. And I hope that the County Board will hold staff to a higher standard that meets the county’s goals and objectives to protect the environment rather than the low bar of the law.

Cost

The $47.86 million in “total cost” appears to be on the high side. Even accounting for the parking garage by doubling the maximum building square footage to110,000 sq ft, the price tag comes to over $430 per square foot. That is almost 4 times the “high” estimate for constructing a community center in Arlington. VA, using BuildingJournal.com’s online construction-cost estimating tool:

Community Center Construction Cost Estimate – BldgJournal.jpg

Summary

Given the similar circumstances and undesirable results on the Ashlawn Elementary School site, neither staff nor the County Board can claim ignorance if they permit a repeat on the Lubber Run Community Center site. This time, as I understand it, there won’t even be a use permit to govern what occurs on this site, giving staff a completely free hand. Again, I ask County Board members to defer approval of the project’s design in order to obtain public feedback. I also ask the Board to use the extra time to request that the County Manger come back in September to produce a list of proactive steps staff will take to ensure that the failures on the Ashlawn site are not repeated and that the project and its building’s design are environmentally sound and are consistent with the goals and objectives of Arlington County’s Natural Resources Management Plan (adopted 2014).

Thank you for your time and consideration.

With kind regards,
Suzanne Smith Sundburg
Arlington, Va.